STOCKYARD // INVENTORY SIMULATORLIVE

01 / ENTER YOUR OPERATION

Your warehouse.
Your numbers.

Punch in your operation specs. The grid renders your ROI in real time — no email required.

part numbers in your catalog
sq ft of floor space
line items picked per day
ENTER SPECS TO GENERATE RESULTS
METRICCURRENT EST.WITH STOCKYARD
PICK TIME / ORDER
— MIN
— MIN
BIN UTILIZATION
—%
—%
LABOR HRS SAVED / WK
0 HRS
— HRS
INVENTORY ACCURACY
94.2%
—%
EST. ANNUAL SAVINGS
$0
$—
PAYBACK PERIOD
UNKNOWN
— MOS
BASED ON 340+ IMPLEMENTATIONS · AVG PAYBACK < 12 MOS

02 / COST OF DISORDER

What the
mess
costs.

Every warehouse running on paper tickets, gut instinct, and tribal knowledge bleeds money through the same nine holes. These are the industry averages. Your numbers are probably worse.

ONE INCORRECT SHIPMENT TO AN ASSEMBLY PLANT CAN TRIGGER $10,000 FINES FOR EVERY MINUTE THE PRODUCTION LINE IS DOWN.

MISPICK RATE

3.8%

of all picks ship wrong part

ANNUAL SHRINKAGE

$47,200

avg per 40K sq ft operation

PRODUCTION FINE

$10,000/MIN

if wrong part halts assembly line

OVERTIME HOURS

22HRS/WK

chasing parts that "should be here"

STOCKOUT EVENTS

14/MO

avg without real-time bin tracking

INVENTORY ACCURACY

94.2%

industry avg without WMS

CYCLE COUNT DOWNTIME

3DAYS/QTR

operations frozen for annual physical

PAPER PICK TICKETS

480/SHIFT

printed, lost, or illegible daily

VIN LOOKUP ERRORS

8.4%

wrong fitment shipped to customers

⚠ INDUSTRY DATA · AUTOMOTIVE AFTERMARKET · 2024

Sources: AIA, AAIA, WMS Implementation Studies · 535,000 companies · $500B market

03 / SYSTEM IN MOTION

Every forklift route
makes sense.

PICK-PATH OPTIMIZER

Route recalculates every scan. 25+ product fields, 6 weeks of velocity data.

RECVA-01SORTB-03BINC-12PICKD-07PACKE-02SHIPDOCK

TRAVEL DIST

−38%

PICKS/HR

+52%

VIN-DECODED CATALOG

Scan VIN → instant ACES VCdb fitment match → bin location in 0.3 seconds.

VIN

1HGBH41JXMN109186

SCANNING...

PART NO

ALT-4CYL-2.4L

BIN LOC

C-12-04

SCAN ACCURACY

99.88%

LOOKUP TIME

0.3s

REAL-TIME INVENTORY MAP

Floor activity rendered live. Hot zones flag restock needs before stockouts occur.

FLOOR ACTIVITY HEATMAP

LIVE · 06:14 AM

IDLE
ACTIVE
HIGH
CRITICAL

STOCKOUTS

−89%

BIN ACCURACY

99.2%

REAL-TIME BIN TRACKINGVIN DECODE & FITMENT MATCHPICK-PATH OPTIMIZATIONRF SCANNING + VOICE PICKCYCLE COUNT WITHOUT DOWNTIMEMULTI-SHIFT OPERATIONS
REAL-TIME BIN TRACKINGVIN DECODE & FITMENT MATCHPICK-PATH OPTIMIZATIONRF SCANNING + VOICE PICKCYCLE COUNT WITHOUT DOWNTIMEMULTI-SHIFT OPERATIONS

04 / INTEGRATIONS

Plugs into
what you
already run.

If your ERP was built before barcodes existed, Stockyard bridges the gap. Certified connectors to the systems automotive operations actually use — not generic middleware that needs six months of setup.

SETUP TIME

< 2 WEEKS

avg ERP integration time · no custom dev required

SAP

CERTIFIED

ERP

SAP Business One & S/4HANA

NETSUITE

CERTIFIED

ERP

Oracle NetSuite WMS Sync

EPICOR

CERTIFIED

ERP

Epicor Indago WMS Bridge

MITCHELL1

LIVE

CATALOG

Parts catalog & labor data

COPART

LIVE

AUCTION

Salvage vehicle acquisition

IAAI

LIVE

AUCTION

Insurance Auto Auctions

WORLDPAC

LIVE

SUPPLIER

Parts supplier EDI

NAPA

LIVE

SUPPLIER

NAPA Auto Parts network

ACES/PIES

NATIVE

STANDARD

Industry data standard

SHOPIFY

LIVE

ECOMMERCE

Storefront inventory sync

UPS/FEDEX

LIVE

SHIPPING

Carrier rate & label API

QUICKBOOKS

LIVE

ACCOUNTING

GL & AP/AR sync

CERTIFIED
LIVE
NATIVE STANDARD

API-FIRST ARCHITECTURE · REST + EDI + DIRECT DB CONNECTORS

05 / OPERATIONS RUNNING

The floor speaks
for itself.

340+

WAREHOUSES RUNNING

$500B

MARKET SERVED

99.88%

MAX ACCURACY ACHIEVED

44K

SKUS AT 100% ACCURACY

99.88%

INVENTORY ACCURACY

"We had 2,100 vehicles on the lot and no system. Transmissions were anywhere. Stockyard mapped the whole yard in four days — now every VIN has a bin, every bin has a pick time."

Marcus Delgado

Operations Director

Gulf Coast Auto Recyclers

< 12 MOS

FULL PAYBACK

"Our ERP was from 2003. Stockyard bridged it in under two weeks. First shift with the system we cut mispicks to zero. That's 14 years of paper tickets gone in 48 hours."

Jennifer Kowalski

Parts Manager

Midwest OEM Distribution

+340%

ROI LIFT

"Three shifts, 40,000 SKUs, one dock. Before Stockyard we had three hours of overtime every night just finding parts. Now the floor runs itself. Night shift supervisor calls it 'the system that never sleeps.'"

Tony Ramirez

Warehouse GM

Pacific Aftermarket Group

READY TO RUN A TIGHTER FLOOR?

Your warehouse.
Fully loaded.

Talk to Operations ↗